August 14, 2015
Troymet Targets Extensions of High Grade on Redhill Project
August 14, 2015 - Troymet Exploration Corp. (TSXV:TYE) (“Troymet” or the Company”) is pleased to update exploration progress on its Redhill volcanogenic massive sulphide (VMS) project in British Columbia. Troymet has completed the first phase of its data compilation and property examination, and has identified a number of highly prospective drill targets in the Alpha zone.Alpha Zone
The Alpha zone, approximately 2.0 X 2.5 km, encompasses a sequence of felsic to intermediate volcanics, the historic “Redhill zone”, as well as an extensive area of untested soil anomalies (copper >> zinc>>> silver). The volcanics, associated alteration and mineralization are interpreted to represent a stringer zone in the footwall of a VMS exhalative system.
A primary target is an untested, strong, off-hole Pulse electromagnetic (EM) conductor in the vicinity of hole RH-06-25 which intersected 8.97% copper, 4.96 % zinc, 1.27 g/t gold and >30.0 g/t silver over 2.04 metres, including 10.15% copper, 5.45% zinc, 1.41 g/t gold, and >30.0 g/t silver over 1.74 metres. Troymet has re-logged and confirmed this mineralized intersection. The untested off-hole Pulse EM conductor indicates extensions to this mineralization. (Avalon Ventures Ltd. News Release, October 31, 2006).
A 2006 fixed-loop transient EM (FLTEM) survey identified 11 EM conductors in an area ~600 X 1,100 metres. The mineralization in hole RH-06-25 is associated with a medium strength, 200 metre long conductor. Conductors along strike, and other nearby stronger conductors, have not been drill tested. (British Columbia ARIS (Assessment Report Indexing System) Report #28525).
Prior to drilling, Troymet plans induced polarization (IP/R) and EM surveys to identify additional drill targets associated with the EM conductors and the soil anomalies, as well as to explore un-surveyed portions of the Alpha zone.
Beta Zone
The Beta zone, approximately 2.5 X 2.5 km, encompasses a sequence of felsic to intermediate volcanics, graphitic sediments, iron formation +/- locally laminated semi-massive to massive sulphides containing pyrrhotite +/- pyrite +/- minor chalcopyrite. Borehole S83-4 is reported to have intersected stringer zone mineralization grading 2.54% copper, 2.78% zinc, 77.0 g/t Ag, and 0.37 g/t Au over 7.75 metres. (British Columbia ARIS (Assessment Report Indexing System) Report #28371). There is no core extant from this hole for re-logging or confirmatory sampling. The Beta zone appears to stratigraphically overly the Alpha zone in the volcanic sequence. Numerous EM, IP/R and magnetic anomalies are present. Troymet is evaluating the geology, geochemistry and the EM, IP/R and magnetic anomalies to identify drill targets.
Kieran Downes, President and CEO of Troymet, comments: “The Redhill project has responded quickly and well. High quality drill targets have been identified for a modest cost. Troymet hopes success at some of the targets may lead to exciting discoveries on this greenfield project.”
Qualified Person
Kieran Downes, P. Geo., a Qualified Person as defined by National Instrument 43-101, has reviewed and verified the technical information provided in this release.
About Troymet Exploration Corp.
Troymet Exploration Corp. is a junior exploration company with a solid treasury and with projects in British Columbia (Golden Eagle), Manitoba (McClarty Lake) and Utah (Wildcat). Troymet operates the Wildcat and Golden Eagle projects. Hudbay Minerals Inc. is the operator of the McClarty Lake joint venture and must contribute $1,151,052 in joint venture expenditures before Troymet is required to fund its participating interest. Troymet retains a 2% net smelter returns royalty (NSR) on the Key property, British Columbia, which was sold to New Gold Inc. in 2013. Troymet is continuing to evaluate mineral properties for acquisition.
TROYMET EXPLORATION CORP.
Kieran Downes, Ph.D., P.Geo.
President, CEO & Director
For further information, contact: Anthony Zelen
Investor Relations
Tel: 888-456-4952
Cel: 778-388-5258
Email: anthony@senergyir.com
Website: www.troymet.com
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.
This news release contains certain forward-looking information. All statements included herein, other than statements of historical fact, are forward-looking information and such information involves various risks and uncertainties. In particular, this news release contains forward-looking information in respect of: the Redhill Project, including the possible exploration and development of the Redhill Project; the exploration potential and analogous deposit potential of the Redhill Project; future data analysis, sampling plans and exploration plans on the Redhill Project; the timing for exploration and drilling on the Redhill Project; exploration targets and the potential of such exploration targets; and the ability and the timeframe within which the Redhill Project can be advanced. There can be no assurance that such information will prove to be accurate, and actual results and future events could differ materially from those anticipated in such information. This forward-looking information reflects Troymet’s current beliefs and is based on information currently available to Troymet and on assumptions Troymet believes are reasonable. These assumptions include, but are not limited to: the current share price of Troymet’s common shares and the ability to raise future equity financing, if needed, at prices acceptable to Troymet; Troymet’s current and initial understanding and analysis of the Redhill Project; the ability of Troymet to discover viable exploration targets and the results of exploration on the Redhill Project; the cost of exploration, including sampling and drilling, on the Redhill Project; Troymet’s general and administrative costs remaining constant; and the market acceptance of Troymet’s business strategy. Forward-looking information is subject to known and unknown risks, uncertainties and other factors which may cause the actual results, level of activity, performance or achievements of Troymet to be materially different from those expressed or implied by such forward-looking information. Such risks and other factors may include, but are not limited to: the early stage development of Troymet and its projects, and in particular, the Redhill Project; general business, economic, competitive, political and social uncertainties; capital market conditions and market prices for securities, junior market securities and mining exploration company securities; commodity prices; the actual results of current exploration and development or operational activities; competition; changes in project parameters as plans continue to be refined; accidents and other risks inherent in the mining industry; lack of insurance; delay or failure to receive board or regulatory approvals; changes in legislation, including environmental legislation, affecting Troymet; timing and availability of external financing on acceptable terms; conclusions of economic evaluations; and lack of qualified, skilled labour or loss of key individuals. A description of other assumptions used to develop such forward-looking information and a description of other risk factors that may cause actual results to differ materially from forward-looking information can be found in Troymet’s disclosure documents on the SEDAR website at www.sedar.com. Troymet does not undertake to update any forward-looking information except in accordance with applicable securities laws.
You can view the Next News item:August 20th, 2015, Troymet Shareholders Approve All Matters at AGM
You can view the Previous News item:July 27th, 2015, Troymet Updates Wildcat SE Target Area Progress
Back to the main News page, or press the Back button on your browser.